146.3 km 250 km/hr high speed railway line between Bandırma - Bursa - Ayazma - Osmaneli, 3 stations, 156 culverts,
-
Completion Date: 20-12-2012
-
client: GENERAL DIRECTORATE OF INFRASTRUCTURE INVESTMENTS ANKARA
-
Name of Work: Surveying, Design and Engineering Services of the Konya-Mersin Railway
KONYA MERSIN
339.3 Km 250 Km/hr high speed railway line between Konya-Mersin, Maping studies, expropriation plans, soil investigation works, architectural-statics-electrical-mechanicals of 453 culverts, 168 underpasses, 31 overpasses, 65 bridges and viaducts (9.815,00 m), as well as 125 cut-and-cover tunnels (19.859,00 m), 61 drilling tunnels (47.723,00 m) and 9 stations and facilities (126.857,00 m2) Superstructure, Electrification, Signalization and Telecommunication, EIA Report of the Route, Feasibility Studies, Cost Estimations and Quantity Studies and Preparation of Tender Files and Digital Simulations.