320 Km long 2x3 Motorway between Gerede-Merzifon; Connection Roads and Junctions, Total double tube tunnel length 36,3 km (longest tunnel
-
Completion Date: 31-12-2017
-
client: TURKISH STATE RAILWAYS
-
Name of Work: Directorate of Material of the 5th Region
SUVEREN GOZERTEPE
21,2 Km, 80 km/hr, 2 loading stations, 1 siding, single line freight railway between Suveren-Gözertepe. Mapping Studies, Expropriation Plans, Soil Investigation Engineering structures (Culvert, Underpass, Overpass, Turning Bridge, Bridge, Viaduct and Tunnel), 6 tunnels (longest 3,2 km), 6 bridges, Superstructure, Electrification, Signalization and Telecommunication, EIA (Environmental Impact Analysis) Report, Feasibility Studies, Cost estimation and quantitiy studies and Preparation of Tender documents.