320 Km long 2x3 Motorway between Gerede-Merzifon; Connection Roads and Junctions, Total double tube tunnel length 36,3 km (longest tunnel length 5,45 km), Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures on These Roads, Preparation of Economic and Financial Feasibility Report according to the BOT Model. [gallery size="full" link="none" columns="2" ids="1463,1464"]

13
Eyl
HEMSIN CAMLIHEMSIN

12,53 Km 2 x 1 Provincial Road between Hemşin - Çamlıhemşin. Design services include 4 tunnels in total length pf 5,569 , 4 bridges of 3.285m2, traffic projects, road lightings, landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility

31
Ara
SUVEREN GOZERTEPE

21,2 Km, 80 km/hr, 2 loading stations, 1 siding, single line freight railway between Suveren-Gözertepe. Mapping Studies, Expropriation Plans, Soil Investigation Engineering structures (Culvert, Underpass, Overpass, Turning Bridge, Bridge, Viaduct and Tunnel), 6 tunnels (longest 3,2 km), 6 bridges, Superstructure, Electrification, Signalization and Telecommunication, EIA (Environmental Impact Analysis) Report, Feasibility

01
Tem
ANTALYA CELTIKCI

72 km 2 x 2 State road between Antalya Exit - Çeltikçi. Base mapping, soil investigation, 2.1 Km Tunnel design. landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility Report. [gallery link="none" size="large" ids="1502,1503,1504,1501"]

06
Oca
ESENYURT AVCILAR

32 km long, 80 km/hr, 16 stations metro line between Esenyurt-Avcılar-Beylikdüzü. Alignment Studies, Architectural station designs, Electrification, Signalization and Telecommunication, EIA (Environmental Impact Analysis) Report, Feasibility Studies, Cost estimation and quantity studies of the Route and Preparation of Tender documents.

17
Nis
ERZINCAN DIYARBAKIR

404 km,250 km/hr high speed railway line between Erzincan - Diyarbakır - Mardin with 6 stations, Mapping studies, soil investigation, boring tests, tunnels (longest tunnel length 8.745 km), bridges, retaining walls etc. station facilities and detailed design of the railway in accordance with technical specifications, preparation of Superstructure, Electrification, signalization

16
Mar
IZMIR BORNOVA

Procurement of Consultancy Service of İmplementation Projects of Bornova Central Station and Tunnel Type Between Evka 3-Bornova Central Station of Izmır Light Rail System 1,1 Km, 80 km/hr, Light Rail System between Evka 3-Bornova Central Station. Architectural Station Designs, Electrification, Signalization and Telecommunication, Cost estimation and quantitiy studies and Preparation

17
Ara
KAHRAMANMARAS GOKSUN

22,9 Km 2 x 2 State Road, 4,4 km double tube tunnel, soil investigation, traffic, bridge designs (24.440,00 M2). Boring tests, tunnels, bridges, retaining walls etc. and the station facilities and detailed design of the railway in accordance with technical specifications, preparation of EIA report of the route, feasibility study,

20
Ara
KONYA MERSIN

339.3 Km 250 Km/hr high speed railway line between Konya-Mersin, Maping studies, expropriation plans, soil investigation works, architectural-statics-electrical-mechanicals of 453 culverts, 168 underpasses, 31 overpasses, 65 bridges and viaducts (9.815,00 m), as well as 125 cut-and-cover tunnels (19.859,00 m), 61 drilling tunnels (47.723,00 m) and 9 stations and facilities (126.857,00

20
Ara
ESKISEHIR ANTALYA

654,7 km double line 250 km/hr high speed railway between Eskişehir - Antalya. Rmin= 3.500 m, Smax= 16.00 %0. Design Services includes Feasibility Studies, EIA Report, digital mapping, expropriation plans, Geological-Geotechnical Studies, Soil/Rock drilling and in-situ land tests of 16.053,94 m in total. Electricity Resistivity Studies (at 4059 points). Seismic