320 Km long 2x3 Motorway between Gerede-Merzifon; Connection Roads and Junctions, Total double tube tunnel length 36,3 km (longest tunnel
-
Completion Date: 17-12-2013
-
client: GENERAL DIRECTORATE OF HIGHWAYS ANKARA
-
Name of Work: Procurement of Surveying and Design Project Consultancy Services of Tunnel Transition and Connection Roads of Kahramanmaras-Goksun Road
KAHRAMANMARAS GOKSUN
22,9 Km 2 x 2 State Road, 4,4 km double tube tunnel, soil investigation, traffic, bridge designs (24.440,00 M2). Boring tests, tunnels, bridges, retaining walls etc. and the station facilities and detailed design of the railway in accordance with technical specifications, preparation of EIA report of the route, feasibility study, cost estimations and quantity studies of the route and preparation of tender documents;
Procurement of Surveying and Design Project Consultancy Services of Tunnel Transition and Connection Roads of Kahramanmaras-Goksun Road