339.3 Km 250 Km/hr high speed railway line between Konya-Mersin, Maping studies, expropriation plans, soil investigation works, architectural-statics-electrical-mechanicals of 453
-
Completion Date: 08-12-2010
-
client: GENERAL DIRECTORATE OF INFRASTRUCTURE INVESTMENTS ANKARA
-
Name of Work: Surveying, Design and Engineering Services of the Kayseri-Şefaatli Railway
KAYSERI SAFAATLI
108.8 Km double line 250 km/hr high speed railway between Kayseri-Şefaatli.Mapping studies, expropriation plans, soil investigation works, architectural-statics-electrical-mechanicals of 146 culverts, 58 underpasses, 156 overpasses, 12 bridges and viaducts (2.535,00 m) as well as 8 cut-and-cover tunnels (1.478,00 m), 10 drilling tunnels (8.174,00 m) and 3 stations and facilities (35.589,00 m2), Superstructure, Electrification, Signalization and Telecommunication, EIA Report, Feasibility Studies, Cost Estimations and Quantity Studies and Preparation of Tender Files and Digital Simulations.