146.3 km 250 km/hr high speed railway line between Bandırma - Bursa - Ayazma - Osmaneli, 3 stations, 156 culverts,
-
Completion Date: 01-07-2016
-
client: General Directorate of Highways
-
Name of Work: Surveying, Design, Engineering Services of the Road between Antalya Exit-Çeltikçi
ANTALYA CELTIKCI
72 km 2 x 2 State road between Antalya Exit – Çeltikçi. Base mapping, soil investigation, 2.1 Km Tunnel design. landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility Report.


