31
Ara
GEREDE MERZIFON

320 Km long 2x3 Motorway between Gerede-Merzifon; Connection Roads and Junctions, Total double tube tunnel length 36,3 km (longest tunnel length 5,45 km), Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures on These Roads, Preparation of Economic and Financial Feasibility Report according to the BOT Model. [gallery size="full" link="none" columns="2" ids="1463,1464"]

13
Eyl
HEMSIN CAMLIHEMSIN

12,53 Km 2 x 1 Provincial Road between Hemşin - Çamlıhemşin. Design services include 4 tunnels in total length pf 5,569 , 4 bridges of 3.285m2, traffic projects, road lightings, landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility

01
Tem
ANTALYA CELTIKCI

72 km 2 x 2 State road between Antalya Exit - Çeltikçi. Base mapping, soil investigation, 2.1 Km Tunnel design. landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility Report. [gallery link="none" size="large" ids="1502,1503,1504,1501"]

17
Ara
KAHRAMANMARAS GOKSUN

22,9 Km 2 x 2 State Road, 4,4 km double tube tunnel, soil investigation, traffic, bridge designs (24.440,00 M2). Boring tests, tunnels, bridges, retaining walls etc. and the station facilities and detailed design of the railway in accordance with technical specifications, preparation of EIA report of the route, feasibility study,

23
Ara
VAN OZALP

62.26 Km 2 x 2 road between Van-Ozalp, digital mapping, traffic projects, 4 bridges (3.142,00 M2), road lightings, landscaping studies, Bruckner, cost estimate, quantity studies, Viaducts, Bridges, Underpasses and Overpasses, Engineering Structures. Preparation of Economic and Financial Feasibility Report. [gallery link="none" columns="1" size="full" ids="1494"]