13,3 km long double track "3rd rail" underground metro between 4. Levent - Ayazağa with a design speed of 80
-
Completion Date: 31-03-2015
-
client: General Directorate of State Railways of Turkey
-
Name of Work: Supervision, Consultancy and Engineering Services of the Infrastructure Construction of Yerköy-Sivas Section of Ankara-Sivas Railway
YERKOY SIVAS
143 km double line 250 km/hr high-speed railway between Yerköy – Sivas section of Ankara – Sivas Railway. Supervision includes 9 tunnels with total length 14,5 km, 9 viaducts with total length 4,6 km, 30 overpasses, 52 underpasses, 209 culverts. Soil Improvements, Engineering Structures, Material Approvals and Progress Payment Control, Quality Control and Quality Assurance, Provisional and Final Acceptance Services.