33,5 km double line 250 km/hr high-speed railway between Yerköy - Sivas section of Ankara - Sivas Railway. Supervision includes
-
Completion Date: 31-12-2008
-
client: General Directorate of Highways
-
Name of Work: Construction Supervision Services for Bolaman Perşembe Road Works
BOLAMAN PERSEMBE
27,6 km long 2 x 2 highway between Bolaman – Perşembe with a design speed of 100 km/hr. Supervision includes 5 double tube tunnels (Longest tunnel “Nefise Akçelik Tunnel” NATM with 3,815 m length) with total length 9,314m. 66 bridges with a total length of 7,651 m. Soil Works, Engineering Structures, Sea and Creek Fortifications, Bored Piles, Bridges, Tunnels, Sub-foundations, Plant-Mix Foundation and Bituminous Hot Mix. Project Management, Construction Supervision, Material Approvals and Progress Payment Control, Quality Control and Quality Assurance, Provisional and Final Acceptance Services